Safeguards & Security


Description

To continuously improve Safeguards & Security (S&S) performance across DOE by focusing on the protection of Special Nuclear Material (SNM), sensitive information, classified matter, assets, and personnel. The SSWG adds value by bringing together the best and brightest DOE and industry S&S professionals to analyze issues and develop cost-effective solutions that bring clarity and continuous improvement to the DOE missions.

Upcoming Events

No Events

Structure 

 

Safeguards-Security-Working-Group4

 

Leadership

Mike Schwartz

Chair Pacific Northwest National Laboratory Work PO Box 999, MS-K6-15 Richland, WA WA 99352 United States Work Phone: (509) 375-2618

Wade F. Nelson

Vice Chair Los Alamos National Laboratory Work PO Box 1663 Los Alamos NM 87545 USA Work Phone: 505-606-0395

Michelle J. Stellflug

Secretary Pacific Northwest National Laboratory Work P.O. Box 999 Richland WA 99352 USA Work Phone: 509-371-7533

EFCOG Sponsoring Directors

John Clymo

Photo of John Clymo
Director Sandia National LaboratoriesAssoc Lab Director for Infrastructure Operations Work PO Box 5800, MS 0143 Albuquerque NM 87185 Work Phone: (505) 284-3191
Biography

As the NTESS Infrastructure Operations Associate Lab Director, John Clymo will provide leadership to effectively and efficiently manage infrastructure operations, including safeguards and security, environmental restoration and waste management, laboratory facilities and construction, and emergency management.

Clymo has over 30 years of experience in facility and infrastructure operations, maintenance and construction for Department of Energy contractors, university-run laboratories, Department of Defense military installations, and a college campus. He was the Director of Infrastructure Programs at the Idaho National Engineering and Environmental Laboratory, where he led the physical assets maintenance & operations activities. He spent 2 years as Senior Manager of Business & Operations for Lawrence Livermore National Laboratory and 5 years as Deputy Manager for Operations at the Nevada National Security Site. While engaged in Department of Energy work, Clymo served 8 years in leadership positions with the Energy Facilities Contractor Group facilities subgroup. Previously, Clymo spent 18 years with Johnson Controls/Pan Am World Services as General Manager and in other management roles. He also served on the Board of Directors for three different international facility management companies operating in the Asia/Pacific region.

DOE Liaison

Marc Brooks

Supervisory Security Specialist US Department of Energy Work 1000 Independence Ave SW. 760-11G Washington DC 20585 Work Phone: (301)903-4291

Subgroups and Leadership

Information Security Subgroup
Material Control & Accountability Subgroup
Physical Protection Subgroup

Documents

TypeDrawer/FileDate ModifiedSize

pdf
2005 SSWG IOSC Best Practice Enhance Security Through Human Error Reduction (ESTHER) 7:15 pm 07/25/201812.4k

pdf
2005 SSWG InfoSec Best Practice Enhanced Worker Classification Awareness as an Activity Risk Control 7:15 pm 07/25/201814.1k

pdf
2005 SSWG PPM Best Practice Security Requirements Integration Team 7:15 pm 07/25/201813.6k

pdf
2011 SSWG IOSC Best Practice Using Human Performance to Raise Staff Security Awareness 7:15 pm 07/25/2018108.4k

pdf
2012 EFCOG SSWG Seal Reference Guide 7:12 pm 09/19/20182.6M

pdf
2012 SSWG PPM Best Practice Use of a Threat Assessment Team 7:15 pm 07/25/201849.3k

pdf
2013 SSWG IOSC Best Practice Process for Reporting Security Incidents & Concerns 7:15 pm 07/25/2018165.9k

pdf
2013 SSWG PPM Best Practice Simulate Active Shooter, Site Wide Lockdown 7:15 pm 07/25/2018146.4k

pdf
2013 SSWG PhysPro Best Practice Ready Methodology to Stand Up Security Officer Protective Force 7:15 pm 07/25/2018222.3k

pdf
2014 SSWG MCA Best Practice Termination of Safeguards Process 7:15 pm 07/25/201850.8k

pdf
2014 SSWG MCA Termination of Safeguards Controls Best Business Practices 7:27 pm 07/25/2018738.3k

pdf
2014 SSWG PPM Toolkit S&S Self Assessment 7:16 pm 07/25/20181.2M

pdf
2015 SSWG MCA Best Practice NMC&A Requirements for Non Special Nuclear Material (NSNM) 7:16 pm 07/25/2018142.1k

pdf
New Report on Security Metrics 10:38 am 02/03/201661.4k

docx
SSWG FY16 Work Plan 10:38 am 02/03/201622.9k

docx
SSWG FY17 Work Plan 1:23 pm 01/12/201828.4k

docx
SSWG FY18 Work Plan 1:23 pm 01/12/201835k