239 | Coversheet
| 2020-11-18 | Electrical Safety |
238 | Application of Tools Based on EVMS Concepts for Projects under $50M | 2020-11-16 | Earned Value Management System |
237 | Coversheet
Adoption of NFPA 70 (National Electrical Code) 2020 in place of NFPA 70 2017 | 2020-10-20 | Electrical Safety |
236 | Use of Surrogate Containers to Model Isotope Activity Error | 2020-09-09 | Waste Management |
235 | Expectation for Clean and Compliant Waste Transport Vehicles | 2020-09-09 | Waste Management |
234 | Qualifications for the Contractor Authority Having Jurisdiction or Electrical Safety Authority | 2020-04-23 | Electrical Safety |
233 | Regulatory Summary 10 CFR 835, Occupational Radiation Protection | 2020-02-20 | Regulatory & Enforcement |
232 | IEEE 1584 Low Voltage 208Y/120V & 240VAC Arc Sustainability | 2020-02-06 | Electrical Safety |
231 | Welding Requirements Flow-down | 2019-09-18 | Welding |
230 | Evaluation of Medical Travel Variance Requests for Other than Coach Class Seating to Address National Nuclear Security Administration Guidance | 2019-08-09 | Occupational Medicine |
229 | Best Practices in USQ Process in Relation to Contract Transitions | 2019-07-30 | Nuclear Safety |
228 | CsCI Source Exemption from Nuclear Facility Categorization | 2019-07-25 | Worker Safety & Health |
227 | Using Time Dependent HC Threshold Quantities to Predict the Future Hazard Categorization in DOE Nuclear Facilities | 2019-06-24 | Nuclear Safety |
226 | Facility Cold & Dark/Deactivation Process Step Considerations | 2019-06-18 | Deactivation & Decommissioning |
225 | Quality Assurance Considerations for Supply Chain Management in Large-Scale Capital Asset Acquisition Projects | 2019-06-17 | Quality Assurance |
224 | Management of Schedule Reserve/Margin within the Integrated Master Schedule | 2019-06-17 | Risk Management |
223 | Electrical Safety Processes for Utility/Commingled Distribution Systems | 2019-04-16 | Electrical Safety |
222 | Electrical Safety Training Model | 2018-12-18 | Electrical Safety |
221 | Assigning National Electrical Code and Electrical Safety in the Workplace Authority Having Jurisdiction Responsibilities | 2018-12-18 | Electrical Safety |
220 | Earned Value Management System Best Practice | 2018-11-28 | Earned Value Management System |
219 | Use of Premortem Technique in Risk Identification | 2018-11-07 | Risk Management |
217 | Implementing the Safety-Related Maintenance Requirements of NFPA 70E - 2018 Chapter 2 | 2018-08-30 | Electrical Safety |
216 | Filler Material Control - Receipt, Storage, and Issue | 2018-08-29 | Welding |
215 | Welding in Support of Research and Developmentnt | 2018-08-29 | Welding |
214 | Regulatory Summary for 10 CFR 830 Part B | 2018-08-28 | Enforcement |
213 | Adoption of NFPA 70 2017 in place of NFPA 70 2014 | 2018-08-15 | Electrical Safety |
212 | Preparation and Conduct of an Enforcement Investigation | 2018-07-20 | Enforcement |
211 | EFCOG Multiwire Branch Circuit Best Practice | 2018-07-19 | Electrical Safety |
210 | Contact Release Training
Electrical Contact Release Training
| 2018-05-29 | Electrical Safety |
209 | Repurposing and Downgrading of Existing Hazard Category 1, 2, and 3 Nuclear Facilities | 2018-04-12 | Nuclear Safety |
208 | Request for Consent Order/Settlement Agreement | 2018-03-09 | Enforcement Coordination |
207 | Identification of Look-Alike Electrical Equipment | 2018-02-02 | Electrical Safety |
206 | Adoption of 2018 NFPA 70E in place of 2015 NFPA 70E | 2021-02-05 | Electrical Safety |
204 | Combustible Loading Limit Restricts Fire Size to the SSC Capability within the Fire Protection Area | 2017-12-11 | Nuclear Safety |
203 | Risk Assessment/Operation of Overcurrent Protection Devices | 2017-11-15 | Electrical Safety |
202 | Lines of Inquiry for Flowdown of Requirements and Subcontractor Implementation of 10 CFR 851 | 2017-10-17 | Enforcement Coordination |
201 | Welding Program Ownership | 2017-09-19 | Engineering Practices |
200 | Incidental Welding: Welding Activities Not Covered by a Code or a Standard | 2017-09-19 | Engineering Practices |
199 | Regulatory Summary for 10 CFR 830.122 (QA Rule) | 2017-06-29 | Enforcement Coordination |
198 | Stakeholder Engaged Structured Decision Making | 2018-09-20 | Waste Management/Disposition |
197 | Use of Department of Energy Training Institute (DTI) for DOE Complex-Wide Training | 2017-05-25 | Training |
196 | Creating Video Refreshers for Just-in-Time Learning | 2017-05-09 | Training |
195 | Contractor Assurance System Effectiveness Validation | 2017-03-02 | Contractor Assurance |
194 | Calculation Spreadsheet for DC Arc Flash Hazard
DC Arc Flash Calculator | 2019-11-20 | Electrical Safety |
193 | Adoption of NFPA 70E 2015 in Place of NFPA 70E 2012 | 2016-10-18 | Electrical Safety |
192 | Guide to Incorporating Risk Assessment into Integrated Safety Management for Electrical Safety | 2016-07-14 | Electrical Safety, Integrated Safety Management |
191 | On-Site Review and Assessment of Subcontractor Welding Programs, Facilities, and Operations | 2016-06-06 | Engineering Practices |
190 | Non-DOE Owned Transport Equipment Return to Service Inconsistencies | 2016-04-01 | Waste Management/Disposition |
189 | Attributes of a Good NTS Report | 2016-03-15 | Enforcement Coordination |
188 | Electronic Training Forms System | 2016-01-13 | Training |
187 | Reporting Programmatic And Repetitive Noncompliances in NTS and SSIMS | 2016-01-12 | Enforcement Coordination |
186 | Recurring Event or Condition Worksheet
Flowchart
Recurring Event Worksheet
| 2015-12-03 | Occurrence Reporting |
185 | Effective Use of Site-Specific Assessments by Waste Generators in Preparation for Facility Evaluations by the NNSS Radioactive Waste Acceptance Program | 2015-11-12 | Waste Management/Disposition |
184 | Controlled Work Area | 2015-10-30 | Electrical Safety |
183 | Use of a Remote Tapping Tool at Idaho National Laboratory to Minimize Worker Exposure and Avoid Future Contamination Accidents | 2015-10-02 | Deactivation & Decommissioning and Facility Engineering (D&D and FE) |
182 | Use of Earthen Benches and Other Technologies to Support Remediation and Removal of Contaminated River Structures | 2015-10-02 | Deactivation & Decommissioning and Facility Engineering (D&D and FE) |
181 | Safety Culture Monitoring Process/Panel | 2015-09-22 | Integrated Safety Management |
180 | Lockout Tagout Applicability to Physical Separation | 2015-08-19 | Electrical Safety |
179 | NMC&A Requirements for Non Special Nuclear Material (NSNM) | 2015-06-19 | Material Control and Accountability |
178 | Adoption of NFPA 70 2014 in place of NFPA 70 2011 | 2014-11-12 | Electrical Safety |
177 | Adoption of NFPA 70 2011 in place of NFPA 70 2008 | 2015-03-27 | Electrical Safety |
176 | Best Practices in Performing DSA Legacy Reviews | 2014-11-05 | Nuclear Safety |
175 | Variance Analysis | 2014-10-27 | Project Management |
174 | CPR/DID Monthly Validation | 2014-10-27 | Project Management |
173 | Compensatory Arc Flash Controls | 2014-10-01 | Electrical Safety |
172 | Termination of Safeguards Process | 2014-08-31 | Material Control and Accountability |
171 | Metals Moratorium Working Group | 2014-08-31 | Environmental |
170 | Effective Management and Disposal of Radioactive Wastes through application of Consolidation Approaches | 2014-08-07 | Waste Management/Disposition |
168 | Best Practice for GHS Secondary Container Hazard Labeling | 2014-08-05 | Industrial Hygiene and Safety |
167 | Lessons Learned in the Management of DOE Waste Incidental to Reprocessing (WIR) Program Critical to Tank Closures with tanks containing liquid radioactive waste that may be classified as High Level Waste (HLW) resulting in risk reduction at those sites. | 2014-07-28 | Waste Management/Disposition |
166 | Process for Safe, Efficient Laser Service Subcontractor Work | 2014-07-28 | Laser Safety |
165 | Management Assessment Evaluation and Feedback | 2014-06-18 | Assessment, Contractor Assurance, Integrated Safety Management |
164 | Developing a risk based subcontract audit approach | 2014-06-11 | Acquisition & Contracting |
163 | Field Tool for Estimating Incident Energy at Distance Using the Inverse Square Law | 2014-04-24 | Electrical Safety |
162 | Improving the Quality of Subcontractor Welding | 2014-04-22 | Engineering Practices |
161 | Baseline Change Proposals and Contingency | 2014-04-16 | Project Management |
160 | Reference guides to help laser users with laser lab design, laser operations, and laser disposal | 2014-04-01 | Laser Safety |
159 | Adoption of NFPA 70 2008 in place of NFPA 70 2005 | 2014-02-28 | Electrical Safety |
158 | Laser Safety Newsletter | 2014-01-17 | Laser Safety |
157 | Using Laser safety questionnaires to gather assessment information and performance metrics data. | 2013-12-09 | Laser Safety |
153 | Process for Reporting Security Incidents and Concerns | 2013-08-30 | Integrated Safeguards & Security Management |
152 | Cognizant Engineer/Alternate Cognizant Engineer System Assignment List | 2013-08-23 | Engineering Practices |
151 | Task Preview A Risk Based Approach to Error Management in Work Planning | 2013-08-02 | Integrated Safety Management |
150 | Plan of the Day (POD) Leads to an Effective Pre Job Brief | 2013-07-24 | Integrated Safety Management |
149 | Best Practices in Categorical Exclusions Used in Implementing the USQ Process | 2013-07-19 | Nuclear Safety |
148 | Best Practices in Process Monitoring Reviews and Assessments on Implementation of the USQ Process | 2013-07-19 | Nuclear Safety |
147 | PNNL simulates active shooter, site wide lockdown during working hours | 2013-07-19 | Integrated Safeguards & Security Management |
146 | PNNL uses readiness methodology to stand up security officer protective force | 2013-04-29 | Integrated Safeguards & Security Management |
144 | eUSQ Computer Applications to Expedite the USQ Process | 2013-02-27 | Nuclear Safety |
140 | Performance of Commercial Grade Surveys | 2012-12-11 | Engineering Practices |
139 | Development and Use of ORPS Program Performance Indicators | 2012-12-05 | Integrated Safety Management |
138 | Structural Code Guidance for Decontamination and Decommissioning Activities at DOE Facilities | 2012-11-09 | Deactivation & Decommissioning and Facility Engineering (D&D and FE) |
137 | Electrical Code Guidance for Decontamination and Decommissioning Activities at DOE Facilities | 2012-11-09 | Deactivation & Decommissioning and Facility Engineering (D&D and FE) |
134 | Historical Hazard Identification Process for D&D | 2012-08-04 | Deactivation & Decommissioning and Facility Engineering (D&D and FE) |
133 | The Use of Explosives to Demolish the 1853K Cooling Tower | 2012-08-04 | Deactivation & Decommissioning and Facility Engineering (D&D and FE) |
132 | Use of a Threat Assessment Team | 2012-06-18 | Integrated Safeguards & Security Management |
131 | Institutional Risk Management Committee as a vital part of a maturing the Contractor Assurance Process | 2012-06-06 | Contractor Assurance |
130 | Operational Performance Reviews (OPR) as a vital part of a maturing Contractor Assurance Process | 2012-05-25 | Contractor Assurance |
129 | Ensuring Notification of Recordkeeping Personnel When Documents are Created or Revised | 2012-05-25 | Engineering Practices |
128 | Identifying and Capturing Configuration Management Information | 2012-05-25 | Engineering Practices |
127 | Assessing Configuration Control of Drawing Files | 2012-05-25 | Engineering Practices |
124 | Risk based Assessment | 2012-04-20 | Contractor Assurance |
123 | Standardizing Configuration designation Criteria Item Designation/Re | 2012-04-19 | Engineering Practices |
121 | Electrical Safety Assessment Criteria Document | 2012-04-18 | Electrical Safety |
120 | Definitions/Guidance for DOE O 232.2 Occurrence Reporting and Processing of Operations Information, Occurrence Reporting Criteria, Group 2, Subgroup E, Hazardous Electrical Energy Control | 2012-02-25 | Electrical Safety |
119 | Integrated Assessment Plan (IAP) | 2012-02-21 | Integrated Safety Management |
118 | Integration of Multiple Annual Submittals into ISMS Annual Report | 2012-02-12 | Integrated Safety Management |
115 | US DOE Nuclear Criticality Safety Program's Nuclear Criticality Safety Engineer "Hands On" Subcritical and Critical Experiments Training and Education Course | 2011-12-03 | Nuclear Safety, Subcontractor Safety |
114 | Best Practices in Support of Implementing the revised DOE USQ Guide, DOE G 424.11B | 2011-12-03 | Nuclear Safety, Subcontractor Safety |
113 | Understanding, Assessing and Measuring a Culture of Operational Excellence | 2011-11-29 | Integrated Safety Management |
112 | Electrical Safety Position Paper Use of Automated External Defibrillators | 2011-11-09 | Electrical Safety |
109 | Application of Expert USQDs to Expedite the USQ Process | 2011-09-14 | Nuclear Safety |
107 | Recommended Structure for System Health Monitoring and Reporting | 2011-09-21 | Engineering Practices |
105 | Improving Access to and Control of Database Information | 2011-07-22 | Engineering Practices |
102 | Waste Characterization/Classification | 2011-06-13 | Waste Management/Disposition |
101 | Explosive Demolition of Buildings 337, 337B and the 309 Stack at the Hanford's 300 Area | 2011-06-13 | Deactivation & Decommissioning and Facility Engineering (D&D and FE) |
100 | Open Air Demolition of Asbestos Gunite by Using Track Mounted Wet Cutting Saw | 2011-06-13 | Deactivation & Decommissioning and Facility Engineering (D&D and FE) |
98 | Unreviewed Disposal Question Evaluation (UDQE) | 2011-06-05 | Waste Management/Disposition |
94 | Contractor Participation in Enforcement Conferences | 2011-05-12 | Enforcement Coordination |
93 | Student Sustainability Challenge | 2011-05-12 | Environmental |
92 | Using Human Performance to raise staff awareness about potential security situations | 2011-04-04 | Integrated Safeguards & Security Management |
91 | Successful Strategies for Integrating ISMS into the On Boarding Process | 2011-02-26 | Environmental |
89 | Emergency Preparedness Contributes to Correct Radiological and Medical Response Actions | 2011-02-26 | Environmental |
88 | Radiation Protection Technology Training Fast Track | 2011-02-26 | Environmental |
87 | Safety Performance Index | 2010-11-10 | Integrated Safety Management |
85 | ISMS and Safety Culture | 2010-10-26 | Integrated Safety Management |
84 | Subsurface Investigations | 2010-09-01 | Electrical Safety |
82 | Safety Basis Supplement | 2010-08-23 | Nuclear Safety, Subcontractor Safety |
81 | Elements of a Best Practice Safety Equipment List | 2010-08-23 | Engineering Practices |
80 | Naming Conventions for Drawings, Specifications, Manuals and Procedures | 2010-08-23 | Engineering Practices |
77 | Improved EMS/OSH Assessment Strategy | 2010-05-26 | Assessment, Environmental, Integrated Safety Management, Other |
71 | Adoption of NFPA 70E 2009 in place of NFPA 70E 2004 | 2010-03-10 | Electrical Safety |